MODE
DAILY
Choose a planning style
TARGET UNIT
HRS
Target time to complete
TARGET
20H
Total study time required
DEADLINE (YYYY-MM-DD)
DUE
Used to show if plan is enough
PER DAY (MIN)
45
Average minutes you can do
DAYS DONE
0
Optional: days already studied
MISSED DAYS
0
Adds catch-up requirement
WORKING
—
—
—
—
—
PLAN
READY
—
PAGE 1/2
MODE
DAILY
Choose a planning style
TARGET UNIT
HRS
Target time to complete
TARGET
20H
Total study time required
DEADLINE (YYYY-MM-DD)
DUE
Used to show if plan is enough
PER DAY (MIN)
45
Average minutes you can do
DAYS DONE
0
Optional: days already studied
MISSED DAYS
0
Adds catch-up requirement
WORKING
—
—
—
—
—
PLAN
READY
—
PAGE 1/2
WHAT THIS DOES
Turns a target into a plan
Estimates days needed
Checks if you meet deadline
CONVERT TARGET
targetMin = hours×60
If target already in minutes
targetMin = target
DAILY MODE
days = ceil(targetMin / perDay)
Catch-up adds missed days
Needed per day increases
WEEKLY MODE
perDay = perWeek / 7
Then use daily method
Good for realistic planning
DEADLINE CHECK
Deadline uses a rough day count
If days needed > days left
Plan is NOT enough
EXAMPLE
Target 20h → 1200m
45m/day → ceil(1200/45)=27d
Missed 2d → need catch-up
PAGE 2/2